I think I will just make new ones. Lots of crack repairs have been made and they would look better new.
Polishing more of the engine shroud.


Getting ready to repair and polish more of the engine cooling shroud.






Finding the right knob for the glove box.





New knob in place and door installed. 

Polishing up to finish the instrument panel. 





Checking for proper shop head size and height.
This is the tunnel cover assembly piece.



The bottom panels connected along with the landing wheel fillet assemblies attached and the antennas mounted. Turn all this over and it mounts between the gear and behind the lower engine cowl.
Next is primer and paint.



Old and new

Before and after blasting










New panel



