More preparation for covering.

P-K screw rusting. The top of the screws always look ok. It’s when you loosen it up where you get the rust under the screw head. All of them are being replaced like I did on the other wing.
All the screws are out and corrosion prevention applied under the leading edge.

Still working on the wing

I ran short of fabric so I ordered more and it’s here, so I will start covering the starboard wing this week. Finishing up the wiring, cables, and screw replacement.

Before
Cleanup
New screws
Before
Now
Fuel tank strap hold down bolts
New aileron cable attached.
New wiring and wire grommet for position light.